Juao Yd Series Electric Motor Construction Machinery Parts Two Speed AC Motor

Juao Yd Series Electric Motor Construction Machinery Parts Two Speed AC Motor

Why decide on us ?
CZPT MOTOR FEATURES  

CZPT motor body from 56 – 355, output range from .17HP to 430HP

Motor mounting sort B3 (IM 1001), B35 (IM 2001), B5 (IM 3001), B14 (IM 3601), B34 (IM 2101)

Optional voltage 110V, 120V, 220V, 240V, 220/380V, 230V/400V, 380V/660V, 50HZ or 60HZ

Defense sort IP44, IP54, IP55 on request 

Several mounting arrangement for optional           
Aluminum frame, finish shields and base    

Strong cast iron body
Higher toughness cable
Shaft essential and protector supplied        
Superior paint finish         
forty five# metal shaft and stainless steel shaft is optional
CZPT motor constant duty S1,S4
CZPT motor have vacuum impregnation for insulation
CZPT motor is class F insulation and course H insulation is optional
CZPT motor has been make in accordance to CZPT, CE, UL, CCC, GS request

All of our merchandise are make in accordance to GOST, RoHS and IEC normal.

Higher overall performance and IE1, IE2, IE3 efficiency  

 

OUR ELECRIC MOTOR FOR Client Benefits

CZPTity saving and peaceful procedure
CZPT motor can withstand water, dust and vermin
CZPT motor extremely easy installation
CZPT motor reliable Corrosion resistant and prolonged life to work
Reliability performance and very aggressive price tag.
 

HOW TO MAKE MOTOR ON JUAO Business

one. Silicon steel DR510, 800, 600, 360 normal use stamping of lamination stator and rotor die-casting

two. 100% copper winding and inserting stator (handbook and semi-routinely)

three. Stator Vacuum impregnation and drying

4. CNC machining motor shaft, frame, end shields, etc

5. Specialist workman inspecting spare elements each and every processing

six. CZPT motor assembly merchandise line

seven. CZPT motor will one hundred% examination just before portray.

8. CZPT motor spray-paint on motor painting merchandise line

nine. CZPT motor will one hundred% examine once again before packing.

An electric motor from materials to end motor, need to move 15 time examine, and 100% tests, output electricity, voltage, electric powered current, non-load, fifty% load, seventy five% load, a hundred% load and check out the nameplate, packing. Ultimately shipping and delivery to our client.

Product details 

              

Parameter 

Variety

Output

Rated current

Rated velocity

η

Energy aspect

Locked-rotor current

Rated current

Locked-rotor torque

Rated troque

Pull-out torque

Rated torque

KW

IN(A)

nN(rmp)

(%)

(cos Φ)

Tst/TN

Ist/TN

Tmax/TN

YD90L

.forty five

one.9

700

58

.63

1.5

5.five

one.8

.seventy five

one.92

1420

72

.87

one.5

6.5

one.eight

YD100L

.85

3.1

seven hundred

sixty eight

.63

1.five

five.5

one.eight

1.five

3.5

1420

75

.88

1.five

6.5

1.eight

YD112M

1.5

five.

700

75

.63

one.5

five.five

one.eight

2.4

five.3

1420

seventy eight

.88

one.five

6.five

1.eight

YD132S

2.two

seven.

720

75

.sixty four

one.5

five.five

1.8

three.3

seven.one

1440

80

.88

1.five

six.5

1.eight

YD132M

three

nine.

720

78

.65

one.5

5.five

one.8

4.5

9.4

1440

82

.88

one.five

6.5

one.8

YD160M

5

13.9

730

83

.sixty six

one.5

5.5

1.eight

seven.five

15.two

1450

84

.89

1.five

6.5

one.eight

YD160L

7

19.

730

eighty five

.sixty six

1.five

five.5

1.eight

11

21.8

1450

86

.89

1.5

6.5

1.eight

YD180L

11

26.

730

86

.seventy four

one.five

six

one.eight

17

31.5

1470

87

.ninety two

1.5

7

one.8

YD200L1

14

33.

740

86

.seventy four

1.5

6

1.eight

22

41.3

1470

88

.ninety two

one.five

seven

1.8

YD200L2

seventeen

forty.1

740

87

.seventy four

one.5

6

one.8

26

48.8

1470

88

.92

one.five

seven

1.eight

YD225M

24

fifty three.2

740

89

.seventy seven

1.4

six

one.8

34

66.7

1480

88

.88

1.3

seven

1.eight

YD250M

thirty

64.nine

740

ninety

.seventy eight

1.4

six

one.8

forty two

78.8

1480

89

.91

one.3

seven

1.8

YD280S

forty

83.five

740

ninety one

.80

one.four

six

one.eight

55

102

1480

ninety

.91

1.3

7

1.eight

YD280M

forty seven

ninety six.9

680

91

.81

one.four

six

1.8

sixty seven

122.nine

930

ninety

.ninety two

1.three

seven

one.eight

YD90S

.35

1.six

680

fifty six

.60

1.four

6

one.eight

.forty five

1.four

930

70

.72

one.3

seven

one.8

YD90L

.forty five

1.9

710

59

.60

one.5

five

one.eight

.65

one.nine

950

71

.seventy three

one.five

6

one.8

YD100L

.75

two.nine

710

sixty five

.60

one.five

five

one.eight

1.one

3.1

950

75

.73

one.five

6

one.8

YD112M

one.3

four.5

710

72

.61

1.5

five

1.8

1.8

four.8

950

seventy eight

.73

one.five

6

one.eight

YD132S

one.8

five.8

730

seventy five

.62

one.five

5

1.8

2.4

six.2

970

eighty

.73

one.5

6

one.eight

YD132M

2.6

eight.two

730

78

.sixty two

1.5

five

1.eight

3.7

9.four

970

82

.seventy three

one.5

six

one.8

YD160M

4.5

thirteen.3

930

eighty three

.sixty two

1.5

5

one.eight

six

14.7

980

eighty five

.seventy three

one.five

6

one.8

YD160L

6

17.five

930

eighty four

.sixty two

1.5

5

1.eight

eight

19.4

980

86

.73

1.five

six

1.eight

YD180M

seven.five

21.9

930

84

.62

one.5

five

one.8

ten

24.2

980

86

.seventy three

1.5

6

one.eight

YD180L

9

24.eight

730

eighty five

.65

1.5

5

1.8

twelve

28.three

980

86

.75

one.5

six

one.eight

YD200L1

twelve

32.five

730

86

.65

one.5

five

one.8

17

39.1

980

87

.seventy six

one.5

six

one.8

YD200L2

fifteen

forty.three

730

87

.65

one.5

five

one.eight

twenty

forty five.4

980

88

.76

one.five

6

1.eight

YD100L

.seventy five/one.3/1.8

two.sixty two/3.66/4.53

940/1420/2880

sixty seven/seventy two/seventy one

.sixty five/.seventy five/.85

1.eight/one.six/one.six

5.five/six/7

one.8/1.8/one.eight

YD112M

1.1/two/2.4

3.52/five.14/5.eighty

940/1440/2890

seventy three/seventy four/74

.65/.eighty one/.eighty five

one.7/1.four/one.six

five.5/6/7

1.eight/1.eight/one.8

YD132S

1.8/two.6/3

5.14/6.10/7.38

940/1440/2900

75/78/71

.71/.83/.87

one.four/one.3/1.7

five.5/six/7

one.eight/1.8/1.8

YD132M1

2.2/3.three/4

six.03/7.46/8.seventy nine

940/1440/2900

seventy seven/eighty/seventy six

.seventy two/.84/.ninety one

1.3/one.3/1.7

5.five/6/seven

one.eight/1.8/one.8

YD132M2

two.six/4/five

6.86/9.04/ten.eight

940/1440/2900

80/eighty/77

.seventy two/.84/.ninety one

one.five/1.4/1.7

5.5/six/seven

1.eight/one.eight/one.8

YD160M

three.seven/five/six

nine.fifty two/11.2/13.two

940/1440/2900

eighty one/81/76

.seventy two/.eighty four/.ninety one

1.five/one.3/one.4

5.five/six/7

one.eight/one.eight/1.8

YD160L

four.five/7/nine

eleven.four/15.one/18.eight

970/1490/2930

eighty three/83/seventy nine

.seventy two/.eighty five/.ninety two

1.5/1.21.three

five.5/six/seven

1.eight/one.eight/one.eight

YD112M

.sixty five/two/2.four

2.66/five.fourteen/five.80

910/1460/2930

fifty nine/74/74

.63/.81/.eighty five

one.four/1.three/1.2

4.five/6/seven

one.eight/one.eight/1.8

YD132S

one/two.6/three

three.16/6.10/seven.08

710/1440/2900

sixty nine/78/seventy four

.sixty one/.eighty three/.87

1.4/1.two/1.four

four.5/6/seven

one.8/1.eight/1.eight

YD132M

1.three/3.7/four.five

four.56/8.37/10.

710/1440/2900

71/80/75

.61/.eighty four/.91

1.five/1.3/1.4

four.5/6/7

1.eight/1.eight/one.eight

YD160M

2.2/five/6

7.55/11.two/13.two

710/1440/2900

seventy five/eighty one/76

.59/.84/.91

1.4/one.three/1.4

four.five/6/7

1.eight/1.eight/one.eight

YD160L

2.8/seven/nine

nine.21/15.ten/eighteen.80

720/1460/2930

77/83/79

.60/.85/.ninety two

1.3/one.two/1.three

five.five/6.5/seven

one.eight/1.eight/1.8

YD112M

.eighty five/one/one.5

three.seventy two/3.06/three.53

710/940/1400

sixty two/sixty eight/75

.fifty six/.73/.86

one.four/1.two/1.4

five.five/6.5/seven

1.eight/one.8/one.eight

YD132S

one.1/1.five/one.eight

four.ten/4.22/4.03

710/940/1440

sixty eight/seventy four/seventy eight

.60/.seventy three/.87

1.4/one.three/one.3

5.five/six.five/seven

one.eight/1.8/1.8

YD132M1

1.5/two/2.two

5.eighteen/5.forty one/four.87

710/940/1440

seventy one/77/79

.62/.37/.87

one.three/one.five/one.four

five.five/6.five/7

1.eight/1.8/one.8

YD132M2

one.eight/2.six/3

6.thirteen/six.eighty four/6.55

710/940/1440

72/seventy eight/80

.sixty two/.74/.87

one.5/one.5/one.five

five.5/6.five/seven

one.eight/1.8/1.eight

YD160M

three.three/4/five.five

10.2/nine.87/11.6

720/970/1460

79/eighty one/83

.62/.76/.87

1.seven/one.4/1.5

five.five/6.five/seven

1.8/1.8/1.8

YD160L

4.5/6/seven.five

thirteen.8/14.five/15.six

720/970/1460

80/83/eighty four

.sixty two/.seventy six/.87

one.6/one.6/1.five

five.5/6.five/7

one.8/one.8/1.8

Mounting way 

Connection 

FAQ 

Q1: What about the shipping and delivery approaches?

1): For urgent order and gentle fat, you can pick the adhering to convey: UPS, FedEx, TNT, DHL, EMS.

 For weighty excess weight, you can select to supply the products by air or by sea to preserve value.
 

Q2: What about the payment techniques?

A2: We accept T/T, L/C for huge quantity, and for small volume, you can spend us by PayPal, Western Union etc.
 

Q3: How a lot does it cost to ship to my country?

A3: It relies upon on seasons. Fee is different in diverse seasons. You can check with us at all instances.
 

Q4: What is your delivery time?

A4: Typically we generate in 25-30days following the payment arrived.
 

Q5: Can I print our symbol/code/series amount on your motor?

A5: Indeed, of course.
 

Q6: Can I buy some sample for our screening?

A6: Indeed, but it needs some expenses.
 

Q7: Can you customise my solution in specific prerequisite?

A7: Yes, we can offer you OEM.

Juao Yd Series Electric Motor Construction Machinery Parts Two Speed AC Motor